Our solutions


BAGBAD

BAGBADen
Ensure weather conditions are compatible with application of the product.
The surface must be clean, dry and in sound condition.
PREPARATION: Contact us for advice on surface preparation
APPLICATION: Apply one coat of AQUADECKS, allow it to penetrate 15-30min max, apply second coat. Allow it to penetrate. Wipe off or brush out excess product to avoid it drying as a shiny finish on the surface. Allow to dry 12 hours without rain.

BAGBBE

BAGBBEen
Ensure weather conditions are compatible with application of the product.
The surface must be clean, dry and in sound condition.
PREPARATION: Contact us for advice on surface preparation
APPLICATION: On wet wood apply one coat of TROPITECH ALL IN ONE; Allow to dry 1 to 2 hours, apply second coat, allow to dry 1 to 2 hours, apply third coat.

BAGBBG

BAGBBGen
Ensure weather conditions are compatible with application of the product.
The surface must be clean, dry and in sound condition.
PREPARATION: Contact us for advice on surface preparation
APPLICATION: Apply one coat of SOLID COLOR STAIN, allow to dry 4 hours. Apply second coat. Allow to dry 24 hours without rain.

BAGBBI

BAGBBIen
Ensure weather conditions are compatible with application of the product.
The surface must be clean, dry and in sound condition.
PREPARATION: Contact us for advice on surface preparation
APPLICATION: Apply one coat of TEXTROL COLORS and allow to dry 3-4 hours minimum. Apply second coat. Do not allow more than 36 hours between coats.

BAGBBJ

BAGBBJen
Ensure weather conditions are compatible with application of the product.
The surface must be clean, dry and in sound condition.
PREPARATION: Contact us for advice on surface preparation
APPLICATION: Thoroughly stir TEXTROL NACRE and apply one coat. Allow to dry 3-4 hours, Apply second coat. Do not allow more than 36 hours between coats. Allow to dry 24 hours.

 << < 176 177 178 179 180 181 182 183 184 185 186 > >>